by Bob Boyce » Wed Oct 04, 2006 11:34 pm
When I cut the pad for my house out of the side of the slope leading back to the top of the ridge, I had to carve into rock quite a bit. For this reason, grounding may be more difficult for me. I have some minor fill on top of the rock to allow levelling ect, but not a lot.
I would love to ground the heck out of my system. Will drive ground rods at the metal shop building, at each corner. They may end up being short because solid granite is only down a couple of feet back there.
When I dug out front for the septic tank and underground LP tank, I had to dig a trench 6' deep into the granite, so I placed my array pole centered between the two. I will drive at least one grounding rod at the array. I may end up having to lay out buried radial wires in all directions terminating in a circle of shorter ground rods in order to get a decent lightning ground.
Bob